Energy · Oil and gas upstream and midstream

An engineer who can’t find the well file can’t make the call

Well files and asset records pile up across field crews, service companies and project folders, so engineering and operations teams spend time searching instead of deciding.

Document types we handle

  • Well files and drilling reports
  • Well logs and completion records
  • Asset and maintenance documentation
  • Production and operations records

The short answer

How can operators give engineering and production teams reliable well data access?

Operators give teams reliable access by capturing well files, drilling reports and asset documentation the moment they arrive, classifying and indexing each one to the right well automatically, and making the result directly searchable instead of locked behind an archive request. Well and asset data handled this way means engineers spend their time on production and maintenance decisions, not document searches.

Well and asset data access is the digitization, classification and organization of well files, drilling reports and asset documentation an operator collects so engineering and operations teams can reliably find and use it for production planning and maintenance decisions.

Who it’s for

Engineering, production and operations teams at oil and gas operators.

What changes

Engineers search and retrieve well records directly, instead of waiting on an archive request.

Proof

Lease, right-of-way and production files became immediately accessible for an operator with $4.3B in supported assets. See the work

A production call, delayed

Where does well and asset data access break down?

It breaks down the moment a well file exists somewhere, but nobody can say exactly where.

From an engineering desk

A production engineer needs a well’s original completion report to decide on a workover. The file was scanned years ago, but no one remembers which shared drive it landed on, or whether it was ever scanned at all.

A call to the field office turns up a paper copy, eventually, after two days. The workover decision, and the production it would have protected, waits the whole time.

Multiply this across an asset base with thousands of wells, and content sprawl isn’t an inconvenience, it’s a direct drag on how fast the team can respond to what the field is telling them.

The document pattern

What does the well and asset data pattern look like?

Every well file moves through three stages: well file creation, classification and indexing, and engineering and production access. Each stage has a friction point, and each friction point has a downstream cost.

Stage 01

Well file creation

Friction

Drilling reports, well logs and completion records arrive from field crews and third-party service companies in different formats.

Cost: Content sprawl

The same well’s history ends up split across shared drives, paper files and whoever last touched the project.

Stage 02

Classification and indexing

Friction

Staff manually sort and index well files by hand to make them findable later.

Cost: Lost time searching

An engineer spends hours finding a well file instead of minutes, delaying a production or maintenance decision.

Stage 03

Engineering and production access

Friction

Engineers request a well file from whoever controls the archive and wait for a response.

Cost: Delayed decisions

A production planning or maintenance decision waits on document access, not on the engineering itself.

At every stage above, a person is still searching for the file by hand.

Why now

Why is well record digitization moving so fast right now?

Regulators have already proven the model at massive scale, and the industry’s own filing requirements point the same direction.

100M+Oil and gas records digitized by the Texas Railroad Commission, February 2026

Nearly a century’s worth of well records, hearing files, permits and reports are now searchable online. Source: Railroad Commission of Texas.

State regulators are digitizing at scale

The Texas Railroad Commission surpassed 100 million oil and gas records digitized as of February 2026, including well records, hearing files, permits and reports, nearly a century’s worth of documents now searchable.

Source: Railroad Commission of Texas.

Electronic well logs are already required

Texas has required operators to file well logs electronically through the Railroad Commission’s Digital Well Log Submission system since September 2018, confirming the industry’s own direction.

Source: Railroad Commission of Texas.

Historical records don’t expire

Well and asset records are useful for the operating life of the asset, often decades, which means a well file created on paper in one era has to stay accessible to engineers working in a very different one.

Source: industry asset-lifecycle practice.

How we help

How does DataBank support well and asset data access?

We’re the content foundation layer between your content platform and your engineering and production systems, so every well file is captured, indexed and directly searchable.

01 INTAKE

Capture from every source

We capture well files, drilling reports and asset documentation from field crews and service companies into one managed intake process.

Oil and Gas Scanning →
02 REFINE

Indexed to the right well, not filed by hand

Box AI Extract Agents classify each document and match it to the correct well or asset, scoring each for confidence.

Data Refinement Services →
03 MANAGE

One governed record per well

Validated documents land in Hyland OnBase or Box, indexed to the well or asset with access controls, retention and an audit trail.

Content Management Solutions →
04 ACTIVATE

Direct access, not a request queue

Box Automate makes well records directly searchable for engineering and production teams, with access controls in place instead of an archive bottleneck.

Data-Driven Workflow and Automation →

How does a supported process compare with a manual one?

StageManual processWith DataBank
IntakeDrilling reports and well logs arrive from field crews and service companies in different formatsOne managed intake process across every well file source
RefineStaff manually sort and index well files by handDocuments classified and indexed to the right well automatically, with low-confidence matches sent to human validation
ManageWell files spread across shared drives, paper archives and project foldersOne governed record per well in Hyland OnBase or Box, with retention and an audit trail
ActivateEngineers request a file and wait on whoever controls the archiveEngineering and production teams search and retrieve well records directly, with access controls in place

By role

Answers for everyone at the table

A well and asset data decision crosses program, IT, legal, leadership and corporate development. Each role starts with a different question.

Engineering and production program directors

What you’re weighing

How much production and maintenance planning is slowed by hard-to-find well documentation.

How DataBank addresses it

We take well-file sorting and indexing off your team’s desks, so engineers search and retrieve records directly instead of waiting on an archive request.

Request a well and asset data workflow assessment →

Outcomes

What changes when well files are directly accessible?

Engineering and operations teams start from a searchable record, so production and maintenance decisions move faster.

Faster production decisions

Engineers search and retrieve well records directly, instead of waiting on an archive request.

No more content sprawl

Well files are indexed to the right well automatically, instead of split across shared drives and paper.

Regulator and counterparty-ready

A complete well record can be produced quickly, without depending on institutional memory.

Engineering time back

Less searching, less requesting and fewer delayed decisions waiting on document access.

Operator experience

How have operators done it?

A real, already-published DataBank engagement shows the capture and access work this use case depends on.

Operator experience

Merit Energy Company

Challenge

Land and well files were hard for production teams to access.

Result

Lease, right-of-way and production files became immediately accessible, supporting $4.3B in energy assets.

Read the Merit Energy case study →

Security and compliance

How is well and asset data kept secure and auditable?

Well and asset records stay under documented custody from the field or service company to the governed record, with access controls, audit trails and retention enforced on the platform.

Chain of custody

Every handoff logged, paper and digital, from the field or service company to the governed record.

Access controls

Role-based permissions, so staff see only the wells and assets they work.

Audit trails

Every view, edit and routing step recorded.

Retention

Retention schedules applied on the platform and enforced by rule.

Hosting

Your platform, your cloud tenant or The DataBank Cloud, agreed with your IT team at scoping.

Frameworks and certifications

SOC 2 Type II ISO 27001 ISO 27017 24/7/365 threat monitoring
Read about security at DataBank

Getting started

How does a well and asset data engagement start?

We scope against your real well count and document volume, then move quickly regardless of asset footprint.

Talk to an energy specialist

FAQ

Well and asset data questions

Start with this week

How much of this week went to finding a well file instead of acting on it?

Bring your well count, your current document systems and where your biggest access gaps sit. An energy specialist will walk through what it would take to fix it.

Talk to an energy specialist